Copies of documents, such as − but not limited to – Construction Notice to Proceed, Guaranteed Maximum Price (GMP), contractor reporting forms, work orders, project directories, and the like that specify subcontractors and other salient points (noted below) for construction or renovation projects valued at $1,000,000 or more at any facility within Howard County Public School System. Please include information for both currently active projects as well as those completed since March 1, 2025. We do not need every document that mentions subcontractors, just one for each subcontractor or set of subcontractors.
Specifically, we seek:
•
Project name
•
Project number
•
Projected completion date
•
Prime/General Contractor name(s)
•
Construction Manager (at Risk) name
•
Architect/Engineer names
•
Subcontractor names
Excel spreadsheets containing similar information are welcome.
Responsive to this request, using parameters discussed in prior years to identify projects, please find attached a list of construction projects currently active/completed since March 1, 2025, which are over $1,000,000. Bids and Contracts information as presented to the Board of Education for award (and as noted in the attached) can be found at the following:
- https://go.boarddocs.com/mabe/hcpssmd/Board.nsf/files/BNVLET55F750/$file/04%2030%202020%20Bids%20%26%20Contracts%20BR.pdf (see PC-65).
- https://go.boarddocs.com/mabe/hcpssmd/Board.nsf/files/DFBQ88680792/$file/04%2009%2025%20Bids%20and%20Contracts%20BR.pdf (see PC-54).
- https://go.boarddocs.com/mabe/hcpssmd/Board.nsf/files/CYMNV661B3C4/$file/12%2019%202023%20Bids%20and%20Contracts%20BOE.pdf (see PC-35).
The additional attached record contains maintenance projects currently active/completed since March 1, 2025, which are over $1,000,000. Bids and Contracts information as presented to the Board of Education for award (and as noted in the attached) can be found at the following:
- https://go.boarddocs.com/mabe/hcpssmd/Board.nsf/files/DEXFVQ40FD4D/$file/03%2027%2025%20Bids%20and%20Contracts%20BR.pdf(see PC-52 and PC-53).
- https://go.boarddocs.com/mabe/hcpssmd/Board.nsf/files/DGMLPT578CA7/$file/05%2020%2025%20Bids%20and%20Contract%20BR.pdf(see PC-66).
- https://go.boarddocs.com/mabe/hcpssmd/Board.nsf/files/D98GJR44123F/$file/09%2026%2024%20Bids%20and%20Contracts%20BR.pdf (see PC-13 and PC-14).
- https://go.boarddocs.com/mabe/hcpssmd/Board.nsf/files/DGAP6462FB8B/$file/05%2008%2025%20Bids%20and%20Contracts%20BR.pdf(see PC-61).
- https://go.boarddocs.com/mabe/hcpssmd/Board.nsf/files/CXJM5A593614/$file/11%2016%202023%20Bids%20and%20Contracts%20Final.pdf(see PC-21).
- https://go.boarddocs.com/mabe/hcpssmd/Board.nsf/files/DG2QBD687D91/$file/04%2029%2025%20Bids%20and%20Contracts%20BR.pdf (see PC-58).
Please note, HCPSS contracts with the prime contractors directly and not subcontractors, therefore a list of subcontractors is not a bid requirement as they are added by the primes throughout the construction process.